Recently, we installed reinforced concrete to one of our customers in Charlotte.  This particular customer wanted to install an operator lifting device to assist in unloading materials. Their current process was for each product to be unloaded by hand. We determined that in order for them to be able to use the operator lifting device, the concrete underneath would need to be reinforced with rebar and a thicker layer of concrete. First, we excavated the existing concrete (5′ x 5′ x 4″) section. Next, we reinforced with rebar at 12″ on center and re-poured concrete (5′ x 5′ x 12″).